Two stage Decontamination Shower with detergent application followed by wash down shower action. Incorporating a detergent inducing venturi feeding an overhead shower rose and hose brush, and 10 shower nozzles for the secondary wash down. Shown with no optional fittings. Available with Stainless Steel pipework DEC-V-5S. * Shown with PVC strip screens and drain sump, detailing easy access through PVC strip screens. * When the location is of a temporary nature these units can be easily sited by Fork Lift Truck and connected to the water main by using 38mm lay-flat delivery hose.